TRADING ON:
TSX-V: $ 0.18     FRANKFURT: $ 0.09
Fleming Project

  • 100% working interest in 34,325 hectares (84,819 acres)

  • Historical exploration traced a graphitic EM zone where a pitchblende veinlet in a diabase dyke yielded a grab sample with 3.2% U3O8

  • Airborne EM survey (2005) identified numerous conductors; additional claims staked to cover anomalies

  • Airborne VTEM survey (2006) and ground TDEM survey (2007) conducted to define drill targets

Current Program

  • In March / April 2008, four drill holes (1,689 metres) were completed on the property. All holes exhibited elevated values of uranium (up to 3.5 ppm U) and boron (up to 191 ppm B). Hole FLM-08-03 intersected a 39-metre interval of anomalous uranium. Pathfinder elements, such as uranium and boron, are typically elevated in the vicinity of uranium mineralization. For further information regarding this 2008 program please refer to our July 23, 2008 Press Release.
     
  • Plans for further exploration to follow up on these results are in progress.
 
Copyright 2007 Titan Uranium Inc.
Designed and Powered by Blender Media
Home  |  The Company  |  Projects  |  Investors  |  Contact Us  |  Careers  |  Disclaimer